Case studies: Swimming Pools

Leeds

Interserve Specialist Projects selected Bosa Contracts as it's preferred supply chain subcontractor for installing the Sika Tanking System to five pools at two leisure centres in Leeds.

Along with a trained and competent workforce the directors of Bosa Contracts also hold Nebosh and IOSH safety qualifications demonstrating safety commitment from the top. The Sika Tanking system included the Sikadur Combiflex system at construction and day joints. The Sika Tanking system was applied to very tight tolerances of flatness to provide an ideal surface for direct decorative tiling. As Sika Registered contractors Bosa Contracts Limited were able to offer a 12 year Insurance Backed Warranty on materials and workmanship.