Project – Benton Park School
Client – Interserve
Location – Leeds
Materials – Sika Products
Scope of works:
- Erection of cradle access
- Survey
- Removal of defective areas of concrete
- Concrete repairs to exterior columns, beams and surface cracks
- Application of Anti-Carbonation Coatings to all concrete surfaces
About the project:
Faced with concrete deterioration and cracking, the exterior fabric of a school in Yorkshire was in need of a proven and reliable method of repair and refurbishment.
The project posed numerous challenges, but the key priority was to deliver the project without impacting on the normal working of the school. This was successfully achieved by offering a flexible approach to working hours and noise control and through continual liaison with all parties involved.
Safety planning was critical to enable safe uninterrupted access to the school for students and staff. This proactive approach resulting in positive feedback from the School Head.
“The BOSA engineers and the site managers for Interserve were very professional. They worked with the school to ensure that the works were carried out safely and on time whilst taking in to accounts the workings of a busy high school with 1500 students and staff. I would like to thank you and them for the great team work.”
Project – Benton Park School
Client – Interserve
Location – Leeds
Materials – Sika Products
Scope of works:
- Erection of cradle access
- Survey
- Removal of defective areas of concrete
- Concrete repairs to exterior columns, beams and surface cracks
- Application of Anti-Carbonation Coatings to all concrete surfaces
About the project:
Faced with concrete deterioration and cracking, the exterior fabric of a school in Yorkshire was in need of a proven and reliable method of repair and refurbishment.
The project posed numerous challenges, but the key priority was to deliver the project without impacting on the normal working of the school. This was successfully achieved by offering a flexible approach to working hours and noise control and through continual liaison with all parties involved.
Safety planning was critical to enable safe uninterrupted access to the school for students and staff. This proactive approach resulting in positive feedback from the School Head.
“The BOSA engineers and the site managers for Interserve were very professional. They worked with the school to ensure that the works were carried out safely and on time whilst taking in to accounts the workings of a busy high school with 1500 students and staff. I would like to thank you and them for the great team work.”